Every job is a micro-story
From single storefronts to 18,500 sq ft campuses — each card is a real job, real client, measurable outcome. Scroll to see scale build.


Millbrook Ave Retail Strip
800 sq ft · 3 hrs · Lease signed next day
The Problem
Six storefronts with 4 years of sidewalk grime accumulating before a major tenant walkthrough. The property manager had 48 hours notice before prospective tenants arrived.
Equipment Deployed
The Result
800 sq ft of sidewalk and entry aprons restored to bare concrete in a single morning shift. Tenants signed leases.
— Property Manager, Millbrook Realty Group


Westfield Distribution Hub
2,800 sq ft · 6 hrs · OSHA compliant
The Problem
OSHA walkthrough flagged loading dock as slip hazard due to grease and diesel accumulation. Required remediation documentation within 30 days.
Equipment Deployed
The Result
2,800 sq ft of dock apron and bay floors cleaned with OSHA-compliant degreaser. Remediation report provided. No violations at follow-up.
— Operations Manager, Westfield Logistics


Harbor Quarter Dining Row
1,200 sq ft · Overnight · Passed inspection
The Problem
Health inspection scheduled for Tuesday. Grease trap surround and patio slab had 18 months of kitchen grease runoff. Owner called Sunday evening.
Equipment Deployed
The Result
Full patio and grease trap perimeter cleaned overnight Sunday. Passed health inspection Tuesday with zero surface violations cited.
— Owner, Harbor Quarter Brasserie


Greenfield Estates
6,800 sq ft · Weekend · 14 sections
The Problem
Annual community inspection revealed widespread algae on 14 walkway sections, pool deck, and main entrance drive. Board required completion before the summer resident meeting.
Equipment Deployed
The Result
6,800 sq ft across 14 sections, pool deck, and main drive restored in a single weekend. Board meeting proceeded on schedule.
— HOA Property Manager, Greenfield Community Association


Riverside Commerce Center
4,200 sq ft · Overnight · Open by 7 AM
The Problem
Three-story parking deck serving 280 tenants. Oil staining on 60% of surface, drain blockages, and upcoming CAM audit. Could not close the deck during business hours.
Equipment Deployed
The Result
4,200 sq ft of oil-stained parking deck restored in one overnight shift. Drains cleared. Deck open for tenants by 7 AM.
— Facilities Director, Nexcore Property Group


Northgate Corporate Park
18,500 sq ft · 4 nights · 8 buildings
The Problem
Eight-building corporate park with 30-year-old concrete infrastructure. New anchor tenant required facility audit. Three loading docks, four parking structures, and all walkways needed remediation in 4 days.
Equipment Deployed
The Result
18,500 sq ft across 8 buildings completed in 4 nights. Full remediation report and photo documentation delivered. Tenant audit passed.
— Facilities VP, Northgate Asset Management
Measurable results, not promises
Jobs Completed
Since 2019, across all property types
Sq Ft Restored
Concrete, brick, vinyl, and wood surfaces
On-Time Completion
Facility open on schedule, every time
Facility Managers
Across 14 metro areas trust Blast
Property Types Served
No commitment required · Free site assessment
Schedule your walkthrough
A Blast site lead walks your property, identifies surface conditions, and delivers a written scope within 24 hours. No obligation. No upsell pressure.
We assess your surfaces
Identify stain types, surface materials, and access constraints
You receive a written scope
Equipment list, sq ft breakdown, time estimate, and fixed price
We schedule around your operations
Overnight, weekend, or off-peak — your tenants never know we were there
Managing a portfolio?
Blast works with facility management companies overseeing 5 to 300+ sites. Volume pricing, consolidated billing, and a dedicated account lead — not a call center.
Volume pricing from site 3 onward
Tiered rates based on total annual sq footage across all properties
Consolidated monthly invoicing
One invoice, one contact, full job documentation attached
Priority scheduling across all sites
Guaranteed availability windows for your portfolio — no waiting in queue
Compliance documentation package
OSHA remediation reports, before/after photo sets, and service logs
Priya Nambiar
Regional VP, Crestline Property Management — 28 sites, quarterly contract
